levey-jenningstarget-valueSDbaselineresetlot-changekalibrasiwestgard-rulesCLSI-C24quality-control

When to Reset Levey-Jennings Chart Baselines: A Complete Guide

MyQCLabNovember 14, 20264 views
When to Reset Levey-Jennings Chart Baselines: A Complete Guide

Are your lab's Levey-Jennings charts showing persistent shifts or SD issues? Learn when resetting your baseline is statistically valid, when it is not, and how to manage the transition effectively.

Category: QC Basic Concepts | Estimated reading time: 11 minutes

“Just Change the TV” — A Sentence That Needs to Be Slowed Down

At QualityInterpretation, two requests appear repeatedly:

“Change the TV, my chart keeps going up.”

“Use the July SD for August, this month’s is too narrow.”

Both sound reasonable. If the reference no longer reflects the current condition, it is natural to want to update it. The problem is that the same sentence can arise from two very different situations — and in one of them, it should absolutely not be reset.

First situation: the analytical condition has truly changed. A new control lot has arrived, recalibration has shifted the values, or major service has changed the instrument's characteristics. Here, the old baseline is indeed no longer relevant, and maintaining it would generate alarms that do not reflect a real problem.

Second situation: the process is deteriorating, but the chart is showing it correctly. Reagent is nearing expiration, instrument components are beginning to age, or storage temperature is unstable. Here, the chart that “looks uncomfortable” is a chart that is doing its job — it is detecting something that needs to be handled, not hidden with new numbers.

Changing the TV or SD cannot differentiate between these two situations on its own. That is what the Medical Laboratory Technologist (MLT) reading the chart must do.

This article provides a framework to make that distinction — when a reset is legitimate, when it is not, and how to perform the transition if it is time.

Two Types of Resets with Different Functions

Before discussing when, it is necessary to clarify *what* is meant by a reset — because there are two things that are often conflated.

Reset TV only. The reference mean changes, while the SD remains the same or is derived from the old CV multiplied by the new mean. This is the most common situation: a new control lot, or a new reagent or calibrator lot that has been verified. The legacy here is the historical precision information — the CV from the previous period is still valid, only the mean changes because the control source is different.

Reset TV and SD simultaneously. Both are redefined from new data, like a preliminary testing process from scratch. This is for situations where the instrument’s precision characteristics themselves are suspected to have changed — major service, replacement of critical components, instrument relocation, or a new method. Because the old SD can no longer be trusted to reflect the current instrument variation, it cannot be inherited.

This distinction is important because the implications are different. A TV-only reset still stands on a foundation of proven precision. A TV+SD reset is starting from zero — and that requires sufficient data before QC decisions can be relied upon.

Five Situations Requiring a Reset

Situation 1: Changing Control Material Lot

This is the most obvious and best-documented situation. A new control lot is a different production — its mean is almost always different from the previous lot, even if the manufacturer and type of control are the same. Maintaining the old lot’s mean for the new lot will produce a systematic bias on the chart: all points of the new lot will sit on one side of the mean, and 4₁s or 10x rules will be triggered not because of an instrument problem, but because the reference is wrong.

What is reset: TV from parallel data (10–20 measurement points of the new lot alongside the old lot). The SD is not simply copied — it is recalculated from the old CV multiplied by the new mean.

Requirement to use the old CV: The CV originates from a stable period, does not exceed the laboratory’s imprecision target, and the new lot formulation is similar to the old lot. If these requirements are not met, revert to self-estimation with 20 points over 20 days.

If there is no overlap time: do not use the old lot mean for the new lot, even temporarily. What may be inherited temporarily is only the CV, to lower the initial SD. The mean must come from the new lot data, even from a small number of initial measurements that will continue to be updated cumulatively.

The complete procedure is in the article Changing Control Material Lot.

Situation 2: Changing Verified Reagent or Calibrator Lot

This is the most misunderstood situation, as the mechanism is different from changing control material lots.

When a reagent or calibrator lot changes, control values may shift. But shifting does not automatically mean a TV reset is allowed. One question must be answered first: do patient samples also shift?

If patient samples also shift, that shift is a real bias affecting the results reported to physicians and patients. Adjusting the TV in this condition only hides the problem. The correct solution is through recalibration or lot acceptance evaluation — not a TV reset.

If patient samples do not shift but controls do, it is likely a matrix effect — the characteristics of the control material reacting differently to the new reagent lot compared to actual patient samples. In this condition, the TV may be adjusted because the shift is in the control material, not in the analytical process affecting patient results.

This verification refers to the principles in CLSI EP26. Without this verification, a TV reset due to a reagent lot change is a high-risk step.

What is reset: TV only, after patient sample verification. The SD usually does not need to be reset if the reagent lot change does not alter precision.

Situation 3: Scheduled Recalibration

A normally occurring recalibration — scheduled, standard procedure, no extraordinary events — does not automatically require a TV reset.

What needs to be checked after calibration is the magnitude of the control value shift. If the control values after calibration are still within the expected range and there is no consistent shift, the chart continues without a reset. If a visible shift occurs — points after calibration are consistently on one side of the mean — then perform an evaluation.

Practical guidance: shifts less than 0.5 SD do not require specific action, just documentation. Shifts between 0.5–1 SD: perform additional verification before deciding on a reset. Shifts greater than 1 SD: this is a signal that needs investigation — is this a reasonable calibration effect for a new reagent/calibrator lot, or is there another problem?

These 0.5 and 1 SD figures are not universal standard thresholds — they are practical guides based on statistical logic. Each laboratory’s SOP can set its own figures, as long as they are applied consistently.

What is reset: TV, only if the shift is significant and verified not to be a problem. The SD usually does not need to be.

Situation 4: Major Service or Replacement of Critical Components

This is the only situation that almost always requires a reset of both TV and SD simultaneously.

Major service — replacement of detectors, lamps, incubators, dosing pumps, or relocating the instrument to a different room — can fundamentally change the instrument’s precision characteristics. The SD established before service reflects instrument variation that is now physically different. Inheriting that SD into the post-service condition is equivalent to using an old road map for a territory that has already changed.

The procedure is the same as for a new instrument: perform a new preliminary test, at least 20 measurements over 20 days, to establish a TV and SD that reflect the current instrument condition.

One exception: light preventive maintenance (cleaning, routine tubing replacement, checking connections) that does not touch core analytical components usually does not require a reset. The differentiator is whether the replaced component directly affects the measurement signal.

What is reset: Both TV and SD — new preliminary testing.

Situation 5: Cumulative Data Shows Stable Precision Drift

This is the most subtle and easily abused situation.

Over time, the actual CV formed from cumulative data may consistently be larger than the CV established initially. This can signal several things: long-term variation not captured in the initial preliminary test (too short or conditions too homogeneous), gradual changes in the analytical environment, or instrument precision that is indeed slowly deteriorating.

Updating the SD based on this cumulative data is something that can be legitimate — but only with the correct sequence:

  1. Investigate first why the CV is increasing. Is there a cause that can be fixed?
  2. If a cause is found and can be fixed, fix it — do not widen the SD.
  3. If after a thorough investigation there is no specific fixable cause, and data from a stable period truly shows a larger CV, then the SD may be updated.
  4. The new SD is calculated from the data of the stable period — not from the period containing the problems.

What is not legitimate: updating the SD before investigation, or updating the SD because “flags keep appearing” without understanding why. That is not an adjustment — that is dulling the detection capability.

What is reset: SD only, conditionally. TV usually does not need to be changed in this situation.

Decision Flowchart: Before Changing TV or SD

What is NOT a Reason for a Reset (But Is Often Used)

This section is not intended to be judgmental — these situations arise from real pressure in the laboratory. But recognizing them is part of QC interpretation competence.

“The chart looks like it keeps going up.”

A chart that keeps going up is a meaningful pattern, not a display problem. If there is a trend, it needs to be investigated — not flattened with a new mean. A TV reset in this condition hides the signal the chart is sending.

“Last month’s SD fits this month’s data better.”

“Fits better” in what sense? If it means the SD is smaller and alarms appear rarely — that might be because last month’s SD was calculated from a period that was too short or too homogeneous. If it means the SD is larger and alarms don’t appear — that is exactly the “blind QC” condition discussed in the Target Value & SD article.

“Flags keep appearing and disrupting the workflow.”

Flags that keep appearing are signals, not disruptions. Disabling those signals by widening the SD or shifting the TV is institutionalized alarm fatigue. The correct flow is in the QC Reject article.

“The manufacturer’s mean is different from my mean.”

The difference between the laboratory mean and the manufacturer’s mean is normal and expected — not a signal to shift the TV to the manufacturer’s number. A laboratory mean that differs from the manufacturer’s mean is not a problem, as long as it is within a reasonable and consistent range. See the Target Value & SD article for more complete context.

“Reject happened this morning, need a reset before the afternoon run.”

This is the most dangerous situation. A TV or SD reset after a reject has occurred, before the investigation is complete, removes the ability to trace the problem — and potentially allows patient results that have already been affected to pass through undetected. The correct sequence is always: reject → hold patient results → investigate → correct → verify QC → then proceed.

Safe Transition Mechanisms

If it is time for a reset, how do you do it?

Do not reset in the middle of an unresolved problem.

A reset is only legitimate from a stable condition. If currently in a reject investigation or there is an unexplained pattern, resolve it first before setting a new baseline. A new baseline set from problematic data only inherits those problems into the future.

Mark the transition point on the chart.

A vertical line with a label: date, reason, who decided. This is not just documentation formality — this is what makes the chart readable next month by others, or by yourself during an investigation. Without markers, shifts on a chart cannot be distinguished between “this is because of a lot change” and “this is because the process is starting to fail.”

Do not delete or hide old history.

A chart that is archived with transition markers is more informative than a chart started from zero. Old lot or period data is context, not a burden.

New TV from new data. SD from a proven stable CV.

This sequence must not be reversed. A TV cannot be established from a “guess” or from the manufacturer’s mean alone. The CV to be inherited must be from a period known to be stable, not from a period containing forgotten problems.

Document everything.

Date, reason, basis of data used, who decided, who approved. This is not bureaucracy — this is an audit trail that protects the laboratory during accreditation and protects patients every day.

Summary

One Question That Simplifies Everything

All the frameworks above can be summarized into one question before touching the TV or SD:

Am I changing this because the analytical condition has truly changed — or because the chart looks more comfortable if the numbers are changed?

If the honest answer is the latter, that is a sign not to reset, but to investigate deeper. A chart that is uncomfortable to look at is often a chart that is working its hardest.

Closing

Levey-Jennings charts are not just displays — they are records of a process over time. A careless baseline reset is not just a technical issue; it cuts that record and eliminates the ability to trace back when problems arise in the future.

A legitimate reset, performed from a stable condition, with proper procedures and complete documentation, does not weaken the chart — it clarifies it. Because changes correctly recorded become context, not noise.

Required internal links: Levey-Jennings Chart, Target Value & SD, Changing Control Material Lot, Preliminary Testing, Levey-Jennings Chart Patterns, QC Reject

Ready to streamline your QC workflow?

Track control values, get Levey-Jennings charts, and detect Westgard rule violations automatically.

Start Free at myqclab.com

References

  1. 1.Westgard JO, Barry PL, Hunt MR, Groth T. A multi-rule Shewhart chart for quality control in clinical chemistry. Clin Chem. 1981;27(3):493–501.
  2. 2.Westgard QC. Is QC quality compromised? Westgard QC essay (Basic QC Practices). November 2011. https://www.westgard.com/essays/basic-qc-practices/qc-quality-compromised.html
  3. 3.Bio-Rad Laboratories. Best Practices for Lot Changes in Quality Control or Reagents. 2021. https://labroots-public.s3.amazonaws.com/public/files/web_files/Bio-Rad%202021/Best%20Practices%20for%20Lot%20Changes%20in%20Quality%20Control%20or%20Reagents%20PDF.pdf
  4. 4.Clinical and Laboratory Standards Institute (CLSI). C24-Ed4: Statistical Quality Control for Quantitative Measurement Procedures: Principles and Definitions. 4th ed. Wayne, PA: CLSI; 2016.
  5. 5.Clinical and Laboratory Standards Institute (CLSI). EP26-A: User Evaluation of Between-Reagent Lot Variation; Approved Guideline. Wayne, PA: CLSI; 2013.

© 2026 MyQCLab. All rights reserved.